Building summary
Scores below are MAI's system-calculated values from the building record, shown exactly as computed. Ten pieces of equipment were documented on site on October 20, 2026, with nameplate data extracted from photographs.
64
Maintenance Maturity
Developing Documentation / PM
38
Capital Exposure Score
Elevated Capital Exposure
46
Mechanical Risk Score
Moderate-High Risk
Five-year capital exposure (system)
$285,000
MAI's modeled exposure for this building over the next five years. Per-unit Detroit-metro replacement estimates are in the capital planning section: the sequenced work — two R-22 rooftop replacements, a boiler replacement, an air-handler refurbishment, and one pump — spans $229,000–$351,000 at today's local prices, deliberately sequenced across budget years.
Expected service exposure (system)
$21,500
System-calculated expected service spend over the same five-year window, driven by the age of the two R-22 units and the boiler's original burner.
Total replacement exposure (system)
$612,000
Modeled cost of replacing every documented unit at end of life at today's Detroit-metro prices — the long-horizon figure the five-year plan is sequenced against.
The headline story: this building's roof and boiler room carry two generations of equipment. Two packaged rooftop units run on phased-out R-22 — one at 22 years old, one at 18 — and the 2012 boiler is showing section wear with its original burner. The other six units are modern R-410A equipment in fair-to-good condition and need nothing but documented preventive maintenance. The plan below sequences the end-of-life work across five budget years so no single year carries the whole $285,000.
Inspections & compliance
Boiler inspection certificates and safety-control test results on file for BLR 1 (Weil-McLain LGB-15, boiler room) — stored in the building's permanent record, not in a binder in the boiler room.
Boiler inspections — BLR 1
| Inspection | Performed by | Certificate / reference | Last inspection | Next due | Status |
| State boiler inspection | State of Michigan — Boiler Division | Certificate MI-B-2026-0417 | March 12, 2026 | March 2027 | Current |
| Insurance inspection | Hartford Steam Boiler Inspection & Insurance Co. | Report HSB-88-22140 | March 12, 2026 (joint visit) | March 2027 | Current |
CSD-1 controls & safety devices test — BLR 1
ASME CSD-1 periodic testing of the boiler's controls and safety devices, performed with the annual combustion service on September 18, 2026.
| Component | What was tested | Result | Test date |
| Operating control | Cut-out / cut-in at setpoint | Pass | September 18, 2026 |
| High-limit control | Manual-reset high limit trips and locks out | Pass | September 18, 2026 |
| Low-water cutoff | Blowdown test — burner shuts down on low water | Pass | September 18, 2026 |
| Safety relief valve | Try-lever test; set pressure 30 psi verified against plate | Pass | September 18, 2026 |
| Flame safeguard | Flame failure response and pilot turndown test | Pass | September 18, 2026 |
The paperwork lives with the building
Filter and belt sizes, inspection certificates, and CSD-1 results live in the building's permanent record — so the next technician arrives with the right parts already on the truck, and the paperwork is audit-ready when the state or the insurer asks for it.
Capital planning — five-year outlook
Sequenced by urgency so the two end-of-life R-22 units and the boiler don't land in the same budget year. Every figure is a planning estimate localized to this building's own market — Detroit metro — not a national average and not a quote; actual pricing depends on verified capacity, curb and crane requirements, and contractor bids. See "How these estimates are built" below the table.
| Window | Unit | Action | Planning estimate |
| Now – Year 1 | RTU 1 (Carrier, 2004) | Replacement planning — obtain quotes this budget cycle | $40,000–$65,000 |
| Now – Year 1 | RTU 3 (York, year unknown) | Documentation only — recover serial/year/refrigerant from compressor and panel labels at next service visit | Service visit only |
| Years 1–3 | RTU 2 (Trane, 2008) | Budgeted replacement — planned changeout after RTU 1 | $51,000–$81,000 |
| Years 1–3 | P-2 (Taco, 2009) | Budgeted replacement — scheduled pump changeout | $4,000–$6,000 |
| Years 2–4 | AHU 1 (Trane, 2014) | Refurbishment — bearings, belts/sheaves, coil restoration, drain treatment | $16,000–$26,000 |
| Years 3–5 | BLR 1 (Weil-McLain, 2012) | Budgeted replacement — shoulder-season changeout; annual combustion service until then | $88,000–$125,000 |
| Contingent | RTU 3 (York) | Joins the replacement queue if verification shows comparable age; otherwise monitor | $30,000–$48,000 if needed |
| Ongoing | RTU 4 · RTU 5 · RTU 6 · P-1 | Routine PM only; replacements beyond the five-year window | PM costs only |
How the per-unit ranges relate to the system's headline figure: MAI's system-calculated five-year capital exposure for this building is $285,000 — a modeled exposure figure, not a quote and not a simple sum of the rows above. Adding the sequenced rows (RTU 1 at $40,000–$65,000, RTU 2 at $51,000–$81,000, the boiler at $88,000–$125,000, AHU 1 refurbishment at $16,000–$26,000, and P-2 at $4,000–$6,000) spans $199,000–$303,000, and $229,000–$351,000 with contingent RTU 3 included; the modeled $285,000 sits inside that combined span. The two numbers measure different things — modeled five-year exposure vs. the cost of doing every sequenced job outright at today's Detroit-metro prices — and the plan deliberately sequences the work into different budget years so no single year carries all of it.
How these estimates are built
These estimates are localized to the building's own market — Detroit, MI — because installed mechanical prices follow local labor and market conditions; the same unit carries a different price in a different market. The basis: published 2025–2026 installed-cost benchmarks for packaged rooftop units (roughly $2,000–$3,200 per ton in the 3–5 ton class, including curb adapter, gas and electrical reconnection, and disposal; crane work, where required, is extra; larger packaged units are priced from the same benchmark family per ton), adjusted by the RSMeans City Cost Index location factor for Detroit mechanical work: index 100.9 against a national average of 100 — a factor of about 1.01, so Detroit-metro mechanical pricing sits essentially at the national average. (For contrast, Miami's mechanical index in the same RSMeans table is 84.8 — roughly 15% below the national average — which is why estimates are always built for the building's own market.) Boiler and pump figures use the same method against published installed-cost benchmarks for commercial hot-water boilers and end-suction pumps in the Detroit market. Where a nameplate states capacity, the estimate uses it; where it does not (RTU 3), the size class is taken from the cabinet footprint and the figure is marked pending verification. Estimates prepared October 2026. They are planning figures, not quotes: actual pricing varies with verified capacity, installation conditions, equipment tier, and contractor bids.
About this report
This is a sample report. Roosevelt Industrial Complex is a fictional building, and every name, value, and figure on this page was created for illustration. A real MAI report is a planning snapshot built from a field documentation visit — equipment photographs and nameplate data, with AI-assisted extraction (per-read confidence scores shown per unit). It is not an engineering inspection, a condition assessment by a licensed engineer, or a quote. Manufacture years decoded from serial numbers are marked "verify." Cost figures are planning ranges localized to the building's own market — built from published national installed-cost benchmarks adjusted by the RSMeans location factor for that market, as detailed under "How these estimates are built" — and will vary with verified capacity, installation conditions, and contractor bids. Scores are MAI system-calculated values from the building record as of the report date.